End Construction For 3Ph Memu/Dmc1 With Medha Electrical, As Per Drawing: Em15283 Alt.'H', Packing Instruction: 1. The Supplier Shall Pack The End Wall In A Suitably De Signed Returnable Fixture In Such A Way That End Wall Shall Not Get Scratched, Damag Ed, Twisted During Transportation, Storage And Lifting And To Avoid Scratches On Out Er Surface. It Should Be Seperated By Suitable Environment Friendly Blocks To Avaoid R Ubbing Of Two Endwall Surfaces . It Should Have Standard Clamping /Fastening Mechani Sm So That It Can Be Opened Easily. It Should Have Firm'S Identification Mark. 2. First Ret Uranable Fixture Along With End Wall Be Retained By Rcf & This Fixture Shall Be Exchan Ged In The Second Lot Supply And So On. At The End Of The Contact, The Firm Shall Colle Ct The Remaining Returnable Packing Fixture From Rcf. 3. The Packing Fixture/Frame To B E Fabricated Having Sufficient Strenght To Bear Approximate 2 Tonne Load In Static & M Oving Condition Of Two Coach Sets Of End Wall. 4. The Fixture /Frame/Pallet Should Be D Esigned So That The Packed End Wall Preferably Remain In Vertical Position To Minimize S Urface Area. 5. It Should Also Be Suitable For Storage Of End Wallunder Open Sky. [ War Ranty Period: 30 Months After The Date Of Delivery ] ]