CPV: 34621100
174 notices found
Show:

Filters

Country
When published
Type
Sector
Notices by category
Bogie Frame Assly (Machined) For Air Spring In Secondary Suspension For Lh B Coaches To Drg No: (A) 66703001, Col.I Alt.'C' (Or) (B*) 834-0-3-002, Alt 'B' Suppliers Commit Ment Will Be There To Supply As Per Drawing-(A) (For Lhb Non Ac Air Spring Coaches), Or As Per Drawing -(B)(For Lhb-Ac Air Spring Coaches) *For Identification Purpose Of Bogie F Rame, (I)Drg (A) Shall Be Marked With Yellow Paint On Brake Beam End Face On Both Sides Of Bogie Frames And N227 Is To Be Punched In Letter Height Of 10Mm After Year Or Availble Space On Other Location Of Bogie Number Plate, (Ii)Drg (B), A242 Is To Be Punched In Letter Height Of 10Mm After Year Or Availble Space On Other Location Of Bogie Number Plate. The Ratio Of Supply Between (A) & (B) Has To Be Confirmed Before The Issue Of Purchase Order. Rate Quoted Will Be Applicable To Both Drawing-(A) And Drawing-(B). Special Condition : The Material Specificati On For Plates Of Various Thickness Used For Fabrication Of Bogie Frame Will Be As Per E N10025, Part-5, 2005 . Grade S355 J2W+N ,In Lieu Of Earlier Specified Material Grade St 52. 3 And S355 J2 G3 , En10025/29 In Various Related Sub Assembly And Component Drawings A Nd Specn.Mdts-213, Rev-04 Or Latest And Mdts-166, Rev-02 Or Latest Shall Be Generally Fol Lowed. Time Lag Between Shot Blasting And Painting Should Not Be More Than 30 Minute S In Any Case. Packing Condition As Per Document No.Mpm0010 E Ver-6.0 Pi159 & Packing Co Ndition As Per Drg.No. Icf/J&T/Sk-1823. Stage Inspection To Be Done As Below. (A) Raw Mate Rial Stage 1. Ensure The Raw Material Used Using Portable Spectrometer Machining Stage 1. Dimension Al Checks 2. Edge Preparations (B) Welding Stage 1. Weld Parameter To Be Checked And Recorded. (C) Surface Preparation And Painting Stage. 1. Short/Sand Blast To The Requirements. 2. Painting Process A S Per The Specification. 3. Final Product Inspection. [ Warranty Period: 84 Months After The Date Of D Elivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]
Buyer : STORES/SHELL/ICF
Create/Change Date : 2026-04-16 21:29:05 Countries : [India]
Deadline : 2026-04-21 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Set Of Double Ferrule Fittings Of Bp Line Required For Poh Of Vande Bharat Train Set As Per Ann Exure Attached. Material As Per Spec. Icf/Md/Spec.-166 Rev.4 Or Latest. [ Warranty Period: 30 Months Af Ter The Date Of Delivery ] ]
Buyer : DIV. DEPOT/BKN/NORTH WESTERN RLY
Create/Change Date : 2026-04-17 03:27:52 Countries : [India]
Deadline : 2026-05-07 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Manufacture Of Articles For The Bodywork Of Citadis 302 Metro Trains
Buyer : Société des Transports de Tunis
Create/Change Date : 2026-04-16 21:33:44 Countries : [Tunisia]
Deadline : 2026-05-19 00:00:00 Type : Invitation for Bids
Original Language : French
Estimated Value : 0 TND View Details
Door Glass For Train Set Size: - 418X870X18.38Mm For Vande Bharat Train As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Buyer : VARANASI/DIV/NORTH EASTERN RLY
Create/Change Date : 2026-04-17 09:26:34 Countries : [India]
Deadline : 2026-06-01 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Conversion Of Icf And Hybrid Coaches To Automobile Carrier Cum Brake Van Coaches.
Buyer : CW-SHOP-LLH-MECHANICAL/EASTERN RLY
Create/Change Date : 2026-04-17 09:26:34 Countries : [India]
Deadline : 2026-05-08 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Flat Roof Assly For Vande Bharat Tc Type Coaches, As Per Drawing: Mp25Tcfr Version 1, [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Buyer : STORES/TKJ/RCF
Create/Change Date : 2026-04-17 09:26:38 Countries : [India]
Deadline : 2026-05-18 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Frp Side Wall Panels For Lhb Ac3T Coaches., As Per Drawing: Mplswp3Tel Versi On 19. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Buyer : STORES/NORTHERN RLY
Create/Change Date : 2026-04-16 09:26:24 Countries : [India]
Deadline : 2026-06-17 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Emergency Window Arrangement For Improved Lhb Gs Coaches As Per Drawing No. Mi008176 Alt A. Item 1 To 3. Note 1 To 15 Of Same Drg Must Be Follow. Packaging Instructions: As Per Pi113 Ver 2.0. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Buyer : C-BG/BVP/WESTERN RLY
Create/Change Date : 2026-04-16 03:29:27 Countries : [India]
Deadline : 2026-05-11 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
(For Vande Bharat) Supply & Installation
Buyer : MINISTRY OF RAILWAYS
Create/Change Date : 2026-04-16 21:27:55 Countries : [India]
Deadline : 2026-04-22 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Body Parts Processing And Design Of Railway Vehicle Power Test Vehicles
Buyer : 國立高雄科技大學
Create/Change Date : 2026-04-14 15:26:56 Countries : [Taiwan]
Deadline : 2026-04-24 00:00:00 Type : Invitation for Bids
Original Language : cn
Estimated Value : 2500000 CNY View Details
Request For Quotation - Project 55We, Passenger Seats
Buyer : PESA Bydgoszcz
Create/Change Date : 2026-04-16 09:29:22 Countries : [Poland]
Deadline : 2026-04-24 00:00:00 Type : Invitation for Bids
Original Language : Polski
Estimated Value : 0 PLN View Details
One Coach Set Of End Part For Air Conditioned Emu Trailer Coaches To Drg. Nos. Emu/C/Ac-1-1-002, Col-Iii, Alt 'D' -1 No, Emu/C/Ac-1-1-003, Col-I, Alt 'C' -1 No. Special Condit Ion : Special Condition: I) The Manufacturing Facility Requirement As Per Icf/Md/Spec-147, Issue Status-01,Rev-02, Amendment No.02. Ii) Body Bolster To Drg.No.Icf/Mrvc/C/Ss-1-1-005, Alt 'H', Col.I To Be Provided Without A)Side Bearers To Drg.No.Emu/M-1-1-027,Alt 'Z' Col-Ii. B)Grubscrews To Drg.No.Icf/Mrvc/C/Ss-1-1-005, Alt 'H' Item-8, And C)Side Bearer Covers To Drg.No.Emu/M-1-1-027, Alt 'Z' Item-1. Iii)The Under Frame End Part Should Be Supplied With Normal Side Up And Side Bearer Side Down. Details For Satge Inspection. (A) Raw Material S Tage # Ensure The Raw Material Used Using Portable Spectrometer (B) Jig Stage # Assembly Of Sole Bar With Cross Members. # Assembly Of Body Bolster Arrangement. # Welding Of Ribs With Sole Bar. # Placing & Welding Of Top Sheet Arrangement. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (C) Surface Preparation And Painting Stage. # Short/Sand Blast To The R Equirements. # Painting Process As Per The Specification. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members S Hall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-Metallic Corrosion. Sui Table Packing To Be Done To Prevent Damage During Transit, Unloading And Rust Preven Tion During Storage. [Safety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]
Buyer : STORES/SHELL/ICF
Create/Change Date : 2026-04-14 03:25:40 Countries : [India]
Deadline : 2026-04-28 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Self Starter -Engpa S4 De006411 Dry Type Suitable For Godrej Make Fork Lifter - C Ap-03 T0N- Model-Gx300D . [ Warranty Period: 12 Months After The Date Of Delivery ] ]
Buyer : LSD/AJMER/NORTH WESTERN RLY
Create/Change Date : 2026-04-14 03:25:43 Countries : [India]
Deadline : 2026-05-11 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Lwsczac Shell Kit 534 A One Coach Set Of Roof, Sidewall And End Wall For L Wsczac 534 1. Roof Assembly To Drg No 53416001, Alt 'C' - 1 No, 2. Final Roof Element Cpl T O Drg No. 87716014, Alt 'E' - 2 Nos. 3. Final Roof Element Cpl To Drgno. 87716015, Alt 'E' - 2 No S. 3. Side Wall To Drg No. 53414001, Alt 'D' - 1 No. 4. Endwall To Drg No 59315007, Alt 'B' - 2 N Os. Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md/Spec-200, Issue Status-01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md /Spec-315, Issue Status-01,Rev.00, With Amendment No 01. B One Coach Set Of Welding Par Ts On Body Shell And Partition Frames For Lwsczac Coaches To Drg. No. 1. (Lwsczac) 534 10002, Alt 'B' - 1 No. 2. (Lwsczac) 53410054, Alt 'L' - 1 No. 3. 58110016, Alt 'A' - 6 Nos. 4. 58110 015, Alt 'A' - 3 Nos. 5. Aaa10972, Alt 'A' - 3 Nos. 6. Aaa10976, Alt 'Nil' - 1 No. 7. Aaa10977, Alt 'N Il' - 1 No. 8. Aaa10978, Alt 'Nil' - 1 No. 9. Aaa10979, Alt 'Nil' - 1 No. 10. Aab10007, Alt 'A' - 4 Nos. 11. Aaa10963, Alt 'Nil' - 2 Nos. 12. Ssa10018, Alt 'Nil' - 3 Nos. 13. Aaa10967, Alt 'Nil' - 1 No. 14. S Sa10021, Alt 'Nil' - 2 Nos. 15. 58110017, Alt 'C' - 2 Nos. 16. Aaa10970, Alt 'Nil' - 4 Nos. 17. Aaf10 937, Alt 'Nil' - 3 Nos. 18. (Lwsczac)53410001, Item.25, Alt 'R' - 12 Nos. 19. Aab10014, Alt 'Nil' - 4 Nos. C Under Frame Arrangement To Drg No. 85111001 Col 1. Alt 'P' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/Md/Spec-147, Issue Status 01 Rev.02 With Amendmen T No.02. Special Condition : Packing As Per Icf/J&T/Misc-2201, Alt 'E'. Packing As Per Icf/J&T/Sk- 1809, Alt 'A'. Packing Condition As Per Drg.No.Icf/J&T/Misc-2487, Alt 'B' The Underframe Sh Ould Be Supplied As Normal Side Up & Side Bearer Side Down. Packing Conditionas Per Icf /J&T/Sk-1865, Alt 'A'. (A) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrome Ter (B) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (C) Trestle Stage # Marking, Drilling & Tapping Of Holes Wh Erever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # We Ld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Vis Ual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (D) Surface Preparation And Paintin G Stage. # Short/Sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual I Nspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts- 28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floo R With Cross Members To Avoid Bi-Metallic Corrossion. [Safety Item] [ Warranty Period: 30 Months A Fter The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permit Ed: Max 8 Lacs ] ]
Buyer : STORES/SHELL/ICF
Create/Change Date : 2026-04-14 03:25:39 Countries : [India]
Deadline : 2026-05-08 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Shell Kit Item For Lslrd Without Dg Set 1)Underframe Complete To Drg. No. 74111001, Al T 'G' 1 No. The Manufacturing Facility As Per Icf/Md/Specn.147, Issue Status-01, Rev.02 With Amendment No.2. 2)Roof Assembly To Drg. No. 74116001, Alt 'F' - 1 No. To Be Supplied With Welding Pin As Per Drg No 741 10053, Alt "Nil'- 1 No. (With Latest Sub Drawing 49516008, Alt 'A') 3)End Roof Assembly To Drg. No. 58116066, A Lt 'H' - 2 Nos. 4)Location Of 2 Mm Side Wall Assembly To Drg. No. 74114001, Alt 'E' Col.I - 1 No. Location Of Back Pieces To Drg. Nos. 74114071, Alt 'C' And 74114056, Alt 'Nil' Shall Be Assembled On Side Walls. Items Marked As Loose In Drg. Nos. 74114071, Alt 'C' And 74114056, Alt 'Nil' To Be Supplied As Loose, Al Ong With Sidewall Assemblies. The Firm Shall Fulfill The Requirement As Per Icf/Md/Specn. 200, Issue Status-01, Rev-04 With Amendment No.1 5)End Wall Complete Npp End To Drg. No. 74115003, Alt 'C' -1 N O. 6)End Wall Complete Pp End To Drg. No. 74115001, Alt 'H' -1 No The Firm Shall Fulfil The Requiremen T As Per Icf/Md/Spec-315,Issue Status-01, Rev.00. 7) Body Shell Items And Partition Frames To Drg.No. 74110001, Alt 'G' (Except Items 1 To 6) - 1 No. Firm Has To Supply Roof And Sidewall Without Applying Etch Primer . Special Condition : Packing For Roof And Side Wall As Per Schedule A-(To Be Delivered To Shell) Complet E Roof And Side Wall To Be Supplied With Welding Pins Welded To Roof Assembly As Per Drawing. Sch Edule B-(To Be Delivered To Fur) Cap To Drawing No 49516008002 Alt 'A' And Serrated Spring Washer To D Rawing No 49516008003 Alt 'A' Of Required Quantity As Per Drawing Are To Be Packed In Suitable Polyt Hene Bags Of 100 Microns Thickness With Printed Label With Complete Details Kept Inside Hthe Polythene Bags. (Complte Details: 1. Item Description 2.Qty In The Packing 3. Date Of Packing 4.Po No. 5. Type Of Coach 6. Vendor'S Name And Address.) "Polythene Bags To Be Sealed Properly To Prevent Moisture And W Ater Entry". A) I) Packing As Per Icf/J&T/Misc-2201, Alt 'E' Safety Instruction As Per Icf/J&T/Sk-1867, Alt. 'Nil' Ii) Sl.No 16#B Of Note To Drawing 58216002,Alt 'K' To Be Strictly Followed. Packing For End Wall As Per Drg. Icf/J&T/Sk-1809, Alt 'A' Packing Condition For Underframe As Per Icf/J&T/Misc/2487, Alt 'B' Packing Dra Wing For Body Shell Items And Partition Frames. Icf/J&T/Sk-1865, Alt 'A' The Underframe Should Be Su Pplied As Normal Side Up And Side Bearer Side Down. All The Threaded Holes Shall Be Provided With Suitable Dummy Bolts To Safeguard The Threads. [Safety Item] [ Warranty Period: 30 Months After The Da Te Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lac S ] ]
Buyer : STORES/SHELL/ICF
Create/Change Date : 2026-04-14 03:25:38 Countries : [India]
Deadline : 2026-05-07 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
F138 Starter, Engine, Air, Nsn: 2995-01-531-4505Ge, Pn: 9281M79P03
Buyer : DEPT OF DEFENSE
Create/Change Date : 2026-04-14 09:30:25 Countries : [United States]
Deadline : 2026-05-29 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 USD View Details
B52_C17_Harpoon_Priced_Boa_G0006
Buyer : DEPT OF DEFENSE
Create/Change Date : 2026-04-14 09:30:00 Countries : [United States]
Deadline : 2026-04-28 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 USD View Details
Intercar Gangway Mounting
Buyer : MINISTRY OF RAILWAYS
Create/Change Date : 2026-04-14 21:25:55 Countries : [India]
Deadline : 2026-05-27 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Fuel Tank For Power Car Lhb Coaches
Buyer : MINISTRY OF RAILWAYS
Create/Change Date : 2026-04-14 15:24:00 Countries : [India]
Deadline : 2026-04-23 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details
Unified Notice Of Fire Prevention And Safety For Lhb Coaches. Material And Specification Shoul D Be As Per Drg No.Lw64164.Sample To Be Approved Before Supply. [ Warranty Period: 30 Months After T He Date Of Delivery ] ]
Buyer : STORES/PAREL/CENTRAL RLY
Create/Change Date : 2026-04-14 03:25:56 Countries : [India]
Deadline : 2026-05-04 00:00:00 Type : Invitation for Bids
Original Language : English
Estimated Value : 0 INR View Details