- Earthworks: 2,300 M3 - Backfilling Work: 850 M3 - Waterproofing Work: 320 M2 (Buried Waterproofing) - Thermal Insulation Work: 450 M2 (Buried Insulation) - Reinforced Concrete Work: 1425 M3 - Double Wall Work: 615 M2 - Formwork Work: Slab And Raft Formwork : 2680 M2, Wall Formwork: 3280 M2, Staircase And Landing Formwork: 92 M2, Formwork For Beams, Lintels, Chains, Parapets: 545 M2): Total: 6506 M2 - Reinforcement Work: 169,000 Kg - Pavement Paving Work: (Paving Stone Thickness 10 Cm: 80 M2, Paving Stone Format 30X30X40 Vdl: 80 M2): Total: 160 M2 - Covering Work In Slabs On Pedestals: Xxx M2 No Slab On Pedestals.