Link Road Connecting Bishnupur Sonamukhi Rangamati Road And Bishnupur Patrasayer Road, Construction Of One No. Double Barrel Hume Pipe Culvert And One No. Slab Culvert By Replacing Of Old Damaged Hume Pipe Culvert At Ch. 3.604 Km And Ch.4.413 Km Respectively Under Bankura Highway Division In The District Of Bankura.